Certificates and publication sources
Publish certificates only for their documented subjects, scopes and validity.
Mobile-ID capability and service scope
Mobile-ID publishes RAR VNeID SSO/ShareInfo connectivity. Trusted Records deployment scope, authorization and contracts are not verified in the package. Exchange only permitted attributes with purpose/grounds and retention controls; SSO does not sign records.
Mobile-ID ↗Certification by exact product
| Subject / product | Source and scope |
|---|---|
| MobileID SSO v1.0 | OpenID Foundation ↗ Basic OP · Config OP · Dynamic OP · Form Post OP |
| TrustedHub FIDO2 Server / TrustedKey Token Cryptographic Module | Mobile-ID announces FIDO2 / FIPS 140-3 Level 3 (NIST 5331). Complete issuer records were not verified in this run; these are not Trusted Records certifications. |
Organization certification
The template contains Mobile-ID ISO/IEC 27001:2022 certificate SIS351224I008. Inspect the source image and printed scope; the subject must confirm maintained status before publication. This is not a separate certification of all Trusted Records.
Product and deployment evidence
Device models, compatibility, QC reports, security/UAT and acceptance need separate evidence. Identity-product PAD/PCEB certificates do not transfer to the records service.
Review order
Check source → subject/scope → version/configuration → validity/status → service applicability. Open verification items remain in the delivery dossier for Mobile-ID confirmation before publication.
Continue the workflow
Two journeys, one records lifecycle
Connect paper and born-digital records through persistent identifiers, policies and evidence.
Read detailsIntegration quickstart
Exercise ingest → job tracking → registration → verification with synthetic data.
Read detailsIntegrity, provenance and evidence
Each evidence type answers a different question; hashes, timestamps and approvals are not interchangeable.
Read detailsStart with a verifiable scope.
Agree record classes, quality criteria, permissions and evidence before scaling.
Plan assessment
