Projects and readiness

Translate contractual scope into verifiable operational configuration before go-live.

Inputs and starting conditions

Scope/SOW, volumes/milestones, sources, file plan, AI/QC/preservation profiles, sites/devices/staff and connectors.

Workflow and control gates

  1. 01Agree scope
  2. 02Configure profiles
  3. 03Check sites / connectors
  4. 04Review readiness
  5. 05Go live and close

SLA and acceptance criteria must be measurable; readiness covers staff, devices, data and integration. Scope changes retain versions, approvals and cost/schedule impact.

Exceptions and recovery

Unready connectors, unapproved profiles or missing staff block affected go-live scope with remediation owners/deadlines. Closure retains outstanding items and handover evidence.

Roles, outputs and states

ResponsibilitiesEvidence and states
Project administrators coordinate; owners approve SOW/acceptance; technicians verify readiness; operations supervisors execute.SOW/profile versions, readiness checks, go-live approvals, change logs and closure evidence. States: setup → readiness review → approved → active → handed over.

Scenario and acceptance criteria

ILLUSTRATIVE SCENARIO

A project adds a record class; revise scope, QC criteria and acceptance authority before receiving new batches.

Complete only when

Scope and criteria are linked to the correct project version.

Interfaces for this workflow

Start with a verifiable scope.

Agree record classes, quality criteria, permissions and evidence before scaling.