Mobile-ID · Evidence-based trust
Records glossaryContact
Trusted Records · Platform

Digitization control tower

Coordinate queues, stations and staff against actual capacity; expose whether work is waiting for paper, devices, AI or QC.

Inputs and starting conditions

Work queues, station readiness, shifts, project volume, agreed SLA and incident status.

Workflow and control gates

  1. 01Check readiness
  2. 02Allocate work
  3. 03Track bottlenecks
  4. 04Resolve incidents
  5. 05Reconcile end of day

Assign work by skills/permissions; assess SLA by stage and exclude defective work from accepted output. Wireframe dashboards illustrate control methods rather than measured performance.

Exceptions and recovery

Unready stations, overload or incidents require traceable reassignment. Shift close identifies unfinished jobs, paper location, buffered work and the next custodian.

Roles, outputs and states

ResponsibilitiesEvidence and states
Dispatchers assign work; shift leads approve handovers; project managers handle SLA/escalation; technical operations recover stations.Assignments, queue snapshots, incidents, shift receipts and daily reconciliation. States: ready / running / blocked / handed over.

Scenario and acceptance criteria

ILLUSTRATIVE SCENARIO

A scanning station stops mid-shift; reassign eligible work while retaining unreconciled sheets at established locations.

Complete only when

Queues, paper custody and open work reconcile before shift handover.

Interfaces for this workflow

Start with a verifiable scope.

Agree record classes, quality criteria, permissions and evidence before scaling.

Plan assessment

Search Trusted Records

Enlarged source image

Illustrative source image; displayed values are not service commitments.